Be'er Sheva Park Improvements

Updated: July 21, 2023

Summer 2023

Seattle Parks and Recreation (SPR) and our partners Rainier Link2Lake and Seattle Parks Foundation are happy to announce construction for the Be’er Sheva Park Upland Improvements started in June 2023.

The Rainier Beach Link2Lake (RBL2L) Steering Committee is seeking emerging Coast Salish artist(s) to create a two-dimensional public art piece that highlights cultural, historical, and ecological significance of the area now referred to as Be’er Sheva Park in south Seattle.

The public art piece is a 24”x36” illustrated panel to be located on the new beachfront along the southern shores of Lake Washington at Be’er Sheva Park. Our goals are two-fold:

  1. to feature and elevate Indigenous voices that carry ancestral and contemporary connections and understanding of the cultural, historical, and ecological significance of this place; and
  2. to help visitors situate themselves in the landscape by encouraging exploration and connection with Indigenous communities that continue to steward the land and waters across our region.

RBL2L Steering Committee was given a generous donation from the Norcliffe Foundation to create this work.

Compensation
The artist (or collective) selected for the commission will receive a stipend of $7,000. Learn more

The construction is anticipated to run through the end of 2023. The contractor, Wyser Construction will mobilize in the park and a large portion of the park will be closed during construction.

Closures include:

  • basketball court
  • comfort station/restroom
  • park area on the side of Mapes Creek and shoreline access
  • a portion of the Atlantic City Boat Ramp parking lot

SPR and Wyser Construction will work to minimize the impact of construction on the neighborhood. The play area will remain open.

We co-hosted an event on April 1 to provide the community with an update on the park renovation plan and construction impacts. Thank you to everyone who attended and collaborated on the community art piece for the future park.  

Rainier Beach’s 2012 Neighborhood plan surfaced a vision of a civic and commercial core that connects Rainier Beach Link Station to the shores of Lake Washington at Be’er Sheva Park. The Rainier Beach Link2Lake (RBL2L) Steering Committee was formed in 2016 to engage the community in realizing this vision, starting with Be’er Sheva Park improvements.

From 2017-2019 RBL2L facilitated a robust community engagement process to design and voice their vision for Be’er Sheva Park. Community design parties at community centers along with a dozen other events and online surveys provided ample space for the community to shape the park’s future. Through this inclusive and collaborative process, the Rainier Beach community finalized a design that includes improved waterfront access, an outdoor stage, safety features such as lighting along pedestrian walkways and in the parking lot, and basic amenities including grills, picnic tables, and seating. It is a vision that truly reflects the dreams, wishes, and needs of one of Seattle’s most diverse communities.

SiteWorkshop helped develop the schematic design and construction documents for each of the projects: Be’er Sheva Park In-Water & Be’er Sheva Park Upland. Seattle Parks and Recreation is supporting the community by managing the design, construction documentation, permitting, bidding, and phased construction. The design and project construction is a multi-phased approach. The first phase included a comfort station mural which was completed in June 2021 by youth, young adults, and community members.
Mural as seen on three sides of comfort station.

Location

Be'er Sheva Park, 8650 55th Ave S, 98118

Budget

This community driven project began with a $133,0000 Neighborhood Matching Fund (NMF) grant from the Seattle Department of Neighborhoods which provided funding for the initial planning and design. Funding for the overall improvements at Be’er Sheva Park is a public, private partnership with Seattle Parks and Recreation, Rainier Beach Link2Lake, and the Seattle Parks Foundation, who secured funding from a variety of public and private sources including the Metropolitan District Funding, the State of Washington, King County and the City of Seattle to reach the $2.5 million project goal.

Schedule

Design Completion: Fall 2019 (upland phase); Fall 2021 (in-water phase)
Construction: 
  •    Upland: Spring 2023 (all permits received)
  •    In-Water: Anticipated Fall 2023 (permit dependent)
       Permits Pending for In-Water work:
         • Pending - Hydraulic Project Approval (HPA) from Washington State Fish & Wildlife
         • Pending - Approval from the US Army Corp of Engineer

Project Description

Next phase includes two components:

Upland Work: The upland work includes improved waterfront access, new walkways and lighting, picnic tables, barbeques, covered picnic pavilion, fitness area, an outdoor cultural stage, and more! Construction documents for the upland phase of work are complete and construction permits were received October 2022. Funding is secured for the project and construction will start in spring 2023.

In-Water Work:  The In-water phase includes fish habitat enhancement. The in-water phase of the project is underway and headed toward 90%
completion depending on permitting. All funding is secured for in-water work.

Anticipated Impact: Specific areas of the park will be closed during construction.

Community Participation

Seattle Parks and Recreation (SPR) has determined that the project does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with SPR. This information is available to the public on request. The Determination of Non-Significance was issued March 8, 2021
Download the DNS document for additional information
Download the Analysis and Decision of SPR
View the SEPA Environmental Checklist document here
View the DRAFT Shoreline Permit Application Figures document here

Download the meetings information post card and map here

Schematic Design Report - July 2018

Public Meeting #1  3/3/2018

Public Meeting #2  4/21/2018

Public Meeting #3  6/2/2018

Construction Launch Celebration Event  4/1/2023

News Items Links

Parks and Recreation

AP Diaz, Superintendent
Mailing Address: 100 Dexter Ave N, Seattle, WA, 98109
Phone: (206) 684-4075
Fax: (206) 615-1813
pks_info@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Parks and Recreation

Healthy People, Thriving Environment, Vibrant Community